B2B Enterprise SaaS Design System & PrimeNG Resource Management
Project Planning & Cost Management Platform
- My Role
- Senior Product Designer - end-to-end UX, design system architecture and engineering alignment
- Team
- Product owners, a business analyst, frontend and backend developers, and a UX intern I mentored
- Timeline
- 2023 - present · initial release and ongoing evolution of the system
- Platform
- Desktop web application built on PrimeNG (Angular)
- Key Outcome
- Designed one workspace for time tracking, meeting cost, project budgets and portfolio reporting on a 3-tier PrimeNG token system with Light and Dark mode. Logged time and meeting costs roll up into project budgets and PMO dashboards, and every new piece of business logic is labelled as a proposal for sign-off.
Budgets rarely break in one big mistake. They erode in everyday work.
The Problem
Teams planned hours in static spreadsheets. Long meetings, unclear task dependencies and unlogged calls slowly used up project margins and nobody saw it until the monthly report, when it was too late to change course.
My Part
I led product design from requirements to delivery. With the product owners, the business analyst and the developers, I turned complex resource workflows into one desktop app: a time tracker that stays visible, a calendar with day-level time entries, a meetings page that shows what each meeting costs, budget burn on every project and a portfolio view for the PMO - all on one PrimeNG token system. Screens that need new business logic are marked as proposals for the client to sign off.
Brand Foundation & PrimeNG Tokens
One palette, one type family and one token system, verified for contrast.
- Palette with a job: Deep navy (#005D8F, primary/500) is used only for actions and selection. Cool slate neutrals (surface/50 to 950) separate areas by tone and light 1 px borders instead of heavy lines, which keeps dense screens calm through a full working day.
- Verified contrast: White on primary reaches 7.09:1 (WCAG AAA). After an audit I moved danger text to red/800 (4.43 → 5.99:1), so every status tag passes AA. The timeline’s Today marker reaches 14.63:1.
- Colour is never alone: Every state has a text label, and risks add a warning icon, so status reads without colour - for colour-blind users and in Dark mode.
- Three-tier tokens: Primitive → semantic → component tokens map 1:1 to PrimeNG’s Aura preset. Screens use only semantic and component tokens, so components need no custom CSS overrides and the switch between Light and Dark mode happens in one place.
Calendar Architecture
People plan, attend and log time without switching context.
- Weekly timetable: A 7-day grid shows every meeting across projects. A Participant / Organizer switch separates the meetings you run from the ones you only attend.
- Context on the left: A mini-calendar, a project filter and the selected day’s meeting list let people jump to any date without losing the grid.
- Current-time line: A line across today’s column marks the current time, so people stay oriented during a busy day.
- Log time in place: Clicking a day header opens a side drawer with that day’s work-time entries and their source (stopwatch, manual or from a report), where people add, edit or delete entries.
- Meeting cost: A separate Meetings page lists synced meetings with their cost: duration × attendees × each attendee’s department average hourly rate.
Project Roadmap & Goal Hierarchy
A proposed view that answers “are we on track?” for every goal in a project. Its goal-tracking logic is new, so it waits for the client’s sign-off.
- Two layers, one row: On the left, an expandable tree of goals, key results and milestones with owner and status. On the right, a Gantt-style timeline aligned row by row.
- Actual vs expected: Each bar shows actual progress against the expected pace at today (linear from goal start to target date). A goal is at risk when it trails that pace by 10 percentage points or more.
- Flexible scale: Weeks, Months or Quarters, a Today button and a neutral Today marker with 14.63:1 contrast.
- Risks with a reason: Milestones show as diamonds with dependencies. An at-risk milestone opens a popover with the blocker, the delay and who reported it.
- Details without leaving: Clicking a row opens a goal drawer (Details, Updates, Logged time, Comments) while the timeline stays visible. Owners log progress in a dialog that validates the value as they type.
Dashboards, Budget Tracking & Team Policies
Finance, delivery and the PMO look at the same numbers, at the level of detail they need.
- Portfolio KPIs: The PMO dashboard opens with cards for active projects, labour cost, meeting cost, tasks, delayed and over-budget projects, compared with the previous period.
- Budget burn in the table: Budget-used bars sit in each project row next to logged time and meeting cost. Budgets over 100% and overdue end dates are highlighted.
- Organisation cost breakdown: A drill-down sunburst (portfolio → project → goal) with a table of cost, share and difference against plan.
- Healthy meeting rules: Each department sets a maximum meeting duration, a maximum number of attendees and whether weekly work reports are required. A proposed approval flow lets managers approve or reject reports, with a reason for a rejection.
Light and Dark mode
One token collection for both modes: the same screens and components switch mode through token values instead of being redrawn.
AA+
Every status tag pair passes WCAG AA in Light and Dark mode; primary actions reach AAA (7.09:1).
- Mentoring: Guided a UX intern through design tokens, design-to-dev handoff and component documentation.
- Density without noise: Dense tables separate rows with tonal surfaces and 1 px light lines instead of heavy borders, and status is never shown by colour alone.